Medivet St Ives
Medivet felt their St Ives Clinic could do with updating. Topbuild UK working with Medivet created plans to make an open plan veterinary clinic. To achieve this the decision was made to remove supporting walls which required an architect and structural engineer to continue the planning stage.
A Harmful Discovery
Once the designs were finalised we could set about preparing the site. This involved arranging an asbestos survey prior to any work beginning to identify possible hazards. The survey found there to be a very harmful type of asbestos located in the waiting room ceiling which we had to remove first. Once the site was made safe we could start work.
Hours of Work
Construction Date
Surface Area
Budget
Working After Hours
Like most of our Medivet projects we allowed Medivet St Ives to remain open for business and worked around the clinic and their schedule completely. This was possible by segregating small sections at a time, completing these sections and handing them over to the clinic before moving onto the next section.
The Finishing Touches
Work on site included a full re-wire, fire alarm installation, emergency light installation, new gas supply complete with a new boiler, all plumbing works, installation of steel beams, installation of a suspended ceiling system, full decorating works, stud walls, kennel installation and much more.